Barataria Bay Waterway Bar Channel Maint. Dredging
The work consists of the removal of shoal and satisfactory disposal thereof within the disposal site as shown on drawings. No dike work is required. The estimated time of completion is 70 calendar days after receipt of Notice to Proceed. The solicitation will include seven (7) drawings and specifications.