Description:
The project consists of replacing 500’ of sidewalk curbs, repair of 6 concrete columns, and removal and replacement of 316 square feet of concrete (plus the thickness of the pour) that is under a gate between two parking lots, replace electrical heating coils embedded in the concrete and then pour new concrete with re-bar reinforcement for a complete in kind replacement around the Crescent Ranger Station Office.
Location: Crescent Ranger Station, is located at Address: 136471 US-97, Crescent, OR 97733
The selection process, and evaluation criteria to be addressed, will be outlined in the forthcoming solicitation. The solicitation will be available for download exclusively via https://www.sam.gov on or about 07/29/2024. Paper copies of the solicitation will not be issued. The Government intends to award without discussions, however, reserves the right to conduct discussions should it be deemed in the Government’s best interest.
One Firm Fixed-Price (FFP) contract will be awarded. The contract period of performance will be 60 calendar days from the issuance of the Notice to Proceed, estimated for 09/01/2024.
The magnitude of this construction project is between $25,000 and $100,000. Payment Bonds (100% each) will be required of the successful awardee.
Note: Per FAR 52.204-7(b)(1), System for Award Management (SAM), an Offeror is required to be registered in SAM when submitting an offer and shall continue to be registered until time of award, during performance, and through final payment for any contract resulting from this solicitation. Information on registration may be obtained via: https://www.sam.gov. All Offerors must complete the electronic version of the Representations and Certifications in the SAM system.
This announcement serves as the Pre-Solicitation notice only. Responses to this synopsis are not required.