ACCESS ROAD REPAVING AND REPAIR 7 February 2024: The Project requires paving including demolishing and reconstructing the existing parking lot and roadway described in the W912BU24B0011 Specifications from 07 February 2024 including the removal and replacement of unstable materials. The work also includes painting lines on the reconstructed roadway and parking lots.