Norfolk naval Shipyard requires a service contact to certify and inspect, on a semiannual basis, 13 remote Chemical Storage Lockers (paint locker) and 2 Open Face Paint Booths for a total of 15 dry type fire suppression systems. Each system will require two (2) inspections per year (every 6 months). Historically, due to the needs of the Navy and inter-departmental ownership changes, the total number of pieces of equipment may increase throughout the life of the contract. Therefore, NNSY requires an option to add up to two (2) additional inspections per period. Please see the attached statement of Work for details.