Lagoon Aeration

Key Details
Buyer
AGRICULTURE, DEPARTMENT OF
Notice Type
Combined Synopsis/Solicitation
NAICS
237110
PSC
H146
Due Date (Hidden)
Next 30 days
Posted Date (Hidden)
Past month
Key Dates
Posted Date
November 25, 2024
Due Date
December 16, 2024
Place of Performance
KY
Sam.gov Link
Link
Description

Work for this project requires the contractor to be responsible for for furnishing and supplying all labor,
materials, equipment, utilities, miscellaneous items, freight and delivery and all
necessary valid licenses for the work summarized in the SOW:
1. Furnish and install 480V, 3 PH, 30A feeder from existing panelboard to proposed
aeration equipment disconnect.
2. Furnish and install 480V, 3PH, 30A disconnect, including grounding system, post,
pipe bollards, and conduits.
3. Furnish and install microbubble lagoon aeration system consisting of the
following:
a. Control panel with individual motor overload protection circuit breakers.
b. Self-contained floating microbubble aerators cord connected to control panel
with tethers and anchors (4 each).
4. Locate private and utility owned buried electrical lines in the area of work and
provide location on as-built plans with reference measurements to existing
infrastructure.
5. Furnish third-party inspection of electrical work included in this contract.

The magnitude of this project is between $25,000.00 and $100,000.00

Due Date (Hidden)
Next 30 days
Posted Date (Hidden)
Past month