THIS IS A PROJECT LABOR AGREEMENT (PLA) SURVEY ONLY.
This is a SPECIAL NOTICE. No proposals are being requested or accepted with this PLA notice. The Solicitation No. for this project is W912QR25R0012. The PLA Market Survey is conducted prior to release of the solicitation.
This is a SPECIAL NOTICE only. The U.S. Army Corps of Engineers Louisville District is soliciting comments from the construction community addressing use of a PLA for this construction project at Fort Knox, Kentucky.
DESCRIPTION OF WORK:
The U.S. Army Corps of Engineers (USACE) Louisville District has a requirement for the construction (Design/Bid/Build) of an approximately 132,000 SF Aviation Support Facility (ASF) at Ft Knox Kentucky. The project will meet the standards of the current design requirements which include Aircraft Maintenance Hangar, Administrative Offices, Aircraft Structural Repair, Aircraft Power Plant Repair, Electrical/Avionics Repair, Blade Repair, Supply Warehouse, Ground Support Equipment (GSE) covered storage, Associated Support Items of Equipment (ASIOE) covered storage, POL/HAZMAT storage building, and hangar access aprons. Project also includes fire protection and alarm systems, information systems, intrusion detection system installation, and energy monitoring control systems connection. Sustainability, Energy and Cybersecurity measures are included. Demolish, replace, and relocate the existing military equipment park/organizational vehicle parking. Supporting facilities include selective demolition, site development, utilities and connections, exterior lighting, paving, walks, curbs and gutters, storm drainage, information systems, landscaping, security fencing, and signage. Heating and air conditioning will be provided by self-contained system. Measures in accordance with the Department of Defense (DoD) Minimum Antiterrorism for Buildings standards will be provided. Comprehensive building and furnishings related to interior design services are required. Access for individuals with disabilities will be provided. Facilities will be designed to a minimum life of 40 years in accordance with DoD's Unified Facilities (UFC 1-200-02) including energy efficiencies, building envelope and integrated building systems performance. Air Conditioning (Estimated at 666 kWr/189 Tons). Dispose/Demolish 2 buildings at Fort Knox, KY (3,384 Total SF).
MAGNITUDE:
In accordance with DFARS 236.204, the magnitude of the estimated cost of construction (ECC) range for this project is between $100,000,000 and $250,000,000.00.
FACTORS TO BE CONSIDERED:
Some of the factors that may be considered regarding PLA use are:
(i) The project will require multiple construction contractors and/or subcontractors employing workers in multiple crafts or trades.
(ii) There is a shortage of skilled labor in the region in which the construction project will be sited.
(iii) Completion of the project will require an extended period of time.
(iv) Project labor agreements have been used on comparable projects undertaken by Federal, State, municipal, or private entities in the geographic area of the project.
(v) A project labor agreement will promote the agency's long term program interests, such as facilitating the training of a skilled workforce to meet the agency's future construction needs.
(vi) Any other factors that the agency decides are appropriate.
FEDERAL ACQUISITION REGUATIONS (FAR) 22.502 DEFINITIONS:
Project labor agreement means a pre-hire collective bargaining agreement with one or more labor organizations that establishes the terms and conditions of employment for a specific construction project and is an agreement described in 29 U. S.C. 158(f).
FAR 22.503 – POLICY:
PLA are a tool that agencies may use to promote economy and efficiency in Federal procurement. Pursuant to Executive Order 13502, agencies are encouraged to consider requiring the use of PLAs in connection with large-scale construction projects.
An agency may, if appropriate, require that every contractor and subcontractor engaged in construction on the project agree, for that project, to negotiate or become a party to a PLA with one or more labor organizations if the agency decides that the use of PLAs will:
Advance the Federal Governments interest in achieving economy and efficiency in Federal procurement, producing labor-management stability, and ensuring compliance with laws and regulations governing safety and health, equal employment opportunity, labor and employment standards, and other matters; Be consistent with law. (Refer also to FAR 52.222-33 Notice of Requirement for PLA and FAR 52.222-34 PLA).
INDUSTRY COMMENTS:
The construction community is invited to comment on the solicitation’s inclusion of a PLA using the following questions:
THIS IS NOT A SOLICITATION FOR PROPOSALS AND DOES NOT CONSTITUTE ANY COMMITMENT BY THE GOVERNMENT.
Responses to this PLA market survey will be used by the Government to make appropriate acquisition decisions. All interested sources must respond to future solicitations announcements separately from responses to this market survey. Responses are due no later than 10 (ten) calendar days from this post. Responses are to be emailed to the contract specialist, Jesse Scharlow, at Jesse.E.Scharlow@usace.army.mil.