USDA Dairy Forage Research Center (DFRC)

Key Details
Buyer
DEPT OF DEFENSE
Notice Type
Solicitation
NAICS
236220
PSC
Y1HB
Due Date (Hidden)
Next 3 months
Posted Date (Hidden)
Past day
Key Dates
Posted Date
December 9, 2024
Due Date
January 21, 2025
Place of Performance
WI
Sam.gov Link
Link
Description

The NWD-CENWO has a requirement from the USDA-ARS to provide construction services to build a new Dairy Forage Research Center (DFRC) at Prairie du Sac, Wisconsin.

The Rough Order of Magnitude is between $25,000,000 and $100,000,000.

USACE and USDA-ARS entered into an agreement for CENWO to serve as design and construction agent to build a new Dairy Forage Research Center (DFRC) at the USDA-ARS site at Prairie du Sac, WI. The DFRC supports the USDA-ARS’s mission to accommodate up to 452 lactating cows (maximum), 144 calves, 1300 acres of crops production, 900 acres of pasture and perennials, 12 permanent researchers and staff, up to 12 operations and maintenance personnel, and up to 10 student researchers.

The US Dairy Forage Research Center is located on an approximately 75-acre site on the recently acquired Badger Army Ammunition Plant (BAAP) in Prairie Du Sac, Wisconsin. The Center includes 18 buildings and support structures interconnected by manure collection, transport, and digester system; the approximate combined gross square footage of construction is 642,000 Gross Square Foot (GSF). Construction of approximately 254,003 Building Gross Square Foot (BGSF) of new production, research, operations, and maintenance facilities and supporting infrastructure. Most of the center's construction will be comprised of pre-framed, pre- engineered metal buildings supported on concrete spread footings with the exception of the Lab and Administration Building which will have a laminated wood building structure supported on spread footings with preformed metal panel exterior enclosure.

The overall facility will accommodate up to 452 lactating cows (maximum), 144 calves, 1300 acres of crops production, 900 acres of pasture and perennials, 12 permanent researchers and staff, up to 12 operations and maintenance personnel, and up to 10 student researchers.

Amendment 01 Issued 4 Dec 2024

Amendment 02 Issued 9 Dec 2024

Due Date (Hidden)
Next 3 months
Posted Date (Hidden)
Past day