All work shall be performed IAW the specifications and drawings and shall be completed in strict accordance with the manufacturer’s guidelines. Performance includes, but is not limited to, the following:
Civil/Architectural:
Replace PVC roof membrane system on Cab Roof
Replace PVC roof membrane system on Tower Catwalk
Replace the vinyl Sidings of the ATCT including above and below the Cab windows
Construct stud structural framing and Exterior Insulation Finishing System (EIFS) on the ATCT
Construct perimeter foundation beam for EIFS
Replace the front exterior door (Storefront)
Reconstruct concrete side walk at storefront
Replace defogger system
Move all existing HVAC, electrical, utilities, and conduits away from the new building EIFS
Abate lead paint at building entrance and windows
Mechanical
Replace HVAC packaged unit on the 4th floor.
Install a mini split air conditioning unit in the Telecom room on the 4th floor.
Install common fresh air intake duct for the CAB HVAC units on the 4th floor.