12/10/2024: Update - The contractor questions and answers have been posted under the attachments secion of this solicitation announcement. The solicitation drawings will be updated, and the solicitation close date will be extended, that solicitation amendement documentation should be posted on or around 12/12/2024.
--------------------
Project Title: Carolyn Creek Trail Bridge (GAOA)
The contractor shall furnish all materials, labor, equipment, tools, transportation, supervision, expertise, and other necessary incidentals, except as otherwise provided, to successfully complete this project.
Set-Aside: Total Small Business Set-Aside (FAR 19.5)
Magnitude: Between $100,000 and $250,000 (FAR 36.204(c))
The magnitude is between $100,000 to $250,000. In accordance with FAR 36.204, for construction contracts, we are obligated to state the magnitude of a project using specific price ranges, both in terms of its physical characteristics and estimated price range. However, it's crucial to understand that these price ranges are broad categories and selecting one does not imply that our budget is at the higher end of that range. The intent is to give a general sense of the project's scale without revealing the Government's precise estimate. For instance, if we categorize a project as being "Between $1,000,000 and $5,000,000," it doesn't mean our budget is close to $5,000,000. It simply means the estimated cost falls within that bracket. The actual value could be anywhere within that range. We hope this clarifies the approach outlined by FAR 36.204.
Location: The project is located on a hiking trail with no vehicle access.
Directions:
1. From Elko, NV, drive southeast on NV-227 for 20 miles toward Lamoille, NV.
2. Turn right (south) onto NF-660 (Lamoille Canyon Road) and drive 11.7 miles to the road’s end parking lot.
3. Hike 1.4 miles on the Island Lake Trail to the project site.
Bridge Coordinates: 40.616571, -115.376915
Period of Performance:
• Start Date: 07/14/2025
• Completion Date: 09/12/2025
• Notice to Proceed: 05/15/2025
• All construction work must be completed no later than 09/12/2025.
Site Visit: Not Applicable
Contractor Questions Deadline:
• Date: 12/04/2024
• Time: 12:00 PM PST
• Submit questions using the provided “Contractor Questions and Answers Template.”
• Send all questions to elizabeth.ratcliff@usda.gov ONLY.
• Do not contact anyone else regarding this solicitation.
Request for Proposal (RFP) Close Date:
• Date: 12/18/2024
• Time: 12:00 PM PST
• All proposals must be emailed to elizabeth.ratcliff@usda.gov. No mail submissions (e.g., USPS, UPS) will be accepted.
Quote Submission Instructions:
1. Ensure that you fill out and return the 41 page "RFQ 1240LT25Q0003" document with your quote documents.
2. Ensure that you fill out and return the "J.4 - Contractor Experience Questionare" document with your quote documents.
3. Ensure you provide a "Technical Capability/Approach" statement with your quote documents. This is not an attachment, and must be drafed by the offeror.
4. Do Not Split the solicitation documents.
5. Re-review the entire 41-page document, including all attachments, and additional documents prior to submission.
Pages to Review and Complete:
• Page 2: Offer Section. Fill out all highlighted sections legibly. Use Adobe Acrobat to complete the document electronically rather than handwriting, as handwritten entries may be difficult to read and cause issues entering the quote data into our contracting system.
• Page 5: Enter Unit Price, Total Item Amount, and Total Amount for all line items.
• Page 25: Complete the “Foreign and Domestic Construction Materials Price Comparison” if applicable.
• Page 28: Complete FAR 52.204-8 Annual Representations and Certifications (MAY 2024) by selecting one of the highlighted boxes.
• Page 33: Complete FAR 52.204-24 Representation Regarding Certain Telecommunications and Video Surveillance Services or Equipment (NOV 2021) by marking the #1 and #2 highlighted boxes with the appropriate representation statement.
• Page 36: "Review L.2 Quote Preparation Instructions" for detailed submission guidelines.
Ensure all required sections are completed before submitting your proposal. Proposals not meeting the above requirements may be considered non-compliant.