Repair of Boilers, Associated Services and Distribution Systems
GENERAL DESCRIPTION: The Contractor shall provide all the necessary labor, equipment and materials and performance of all operations in connection with the following: Repairs and/or replacement of 6 psi steam valves through 900 psi steam valves; perform "R" stamp welding; With code required inspections and documentation resurfacing and welding of boiler hand-hole seats; refractory repair; boiler tube repair and replacement; 120 psi air system; 15 psi through 900 psi boiler water feed systems; steam and condensate piping systems; boiler certification; and other associated equipment and systems. This contract also contains provisions for the direct acquisition by the contractor of specialized sub-contracting personnel which may be required to address deficiencies not directly related to boilers but are nonetheless integral components of the power plant and its mission. The areas which may require sub contracted services include but may not necessarily be limited to the pure water facility, screen house, NPDES monitoring systems, oily waste water treatment facility and other miscellaneous facilities or utilities associated with the
power plant.