Contractor should demonstrate construction experience as a prime contractor for Pipeline Dredging, Deep Draft Navigation Channels. Contractor should demonstrate experience in excavating 26,000 Cubic Yards (CYs) per day utilizing a Pipeline Dredge on a Deep Draft Navigation Dredging requirement. The Estimated Number of CYs to be removed for this requirement is Six (6) Million.
In addition to the dredging requirements, this project will also require a Sheet Pile Wall that will need to be constructed along the channel. The Estimated Linear Feet (LF) for this wall is 1,400.
Sources Sought notice is attached for further details