USACE Sabine-Neches Waterway Channel Improvement Project, Port Arthur Canal, Taylor's Bayou, Pipeline Dredging in

Key Details
Buyer
DEPT OF DEFENSE
Notice Type
Sources Sought
NAICS
237990
PSC
Y1KB
Due Date (Hidden)
Next 30 days
Posted Date (Hidden)
Past month
Key Dates
Posted Date
November 25, 2024
Due Date
December 16, 2024
Place of Performance
TX
Sam.gov Link
Link
Description

Contractor should demonstrate construction experience as a prime contractor for Pipeline Dredging, Deep Draft Navigation Channels. Contractor should demonstrate experience in excavating 26,000 Cubic Yards (CYs) per day utilizing a Pipeline Dredge on a Deep Draft Navigation Dredging requirement. The Estimated Number of CYs to be removed for this requirement is Six (6) Million.


In addition to the dredging requirements, this project will also require a Sheet Pile Wall that will need to be constructed along the channel. The Estimated Linear Feet (LF) for this wall is 1,400.

Sources Sought notice is attached for further details

Due Date (Hidden)
Next 30 days
Posted Date (Hidden)
Past month