THIS OPPORTUNITY IS AVAILABLE TO THE SUCCESSFUL NMACC III POOL 2 PHASE 1 OFFERORS ONLY. THIS IS THE SEED PROJECT FOR POOL 2 UNDER 70Z04723RNMACCSB.
This project includes a new bulkhead, tieback/anchors, fender system, concrete cap, cutter utility shore ties (telecom, electrical, water, & sewer), etc. Repair the floating pier and marine fuel distribution system and bilge water tank. Install new sanitary sewer lines to prevent freezing and sloped for positive flow. Site work includes pavement patching, utility work, lighting, striping, etc.
See full solicitation for full description. Project specifications, Drawings, Attachments will be distributed to Pool 2 Phase 2 Offerors via DoDSafe.