DESCRIPTION
Background: The BCLH Stewardship IRSC Phase 1 shall be awarded under the following authority:
Stewardship Authority: Section 604 (16 USC 6591c) of Public Law 108-148 as amended by Section 8205 of Public Law 113-79, the Agricultural Act of 2014—Grants the U.S. Forest Service (Government) permanent authority to enter into stewardship contracts or agreements to achieve land management goals for the National Forests or public lands that meet local and rural community needs. Section 8205 supersedes the temporary authority granted to the Forest Service (Government) in section 347 of Public Law 105-277, the Omnibus Consolidated and Emergency Appropriations Act, 1999.
Stewardship authority grants the Forest Service the authority to aggregate stewardship work activity requirements and solicit those requirements utilizing full and open competition.
This notice is issued for informational purposes only and to provide an opportunity for fall viewing of the project site prior to issuance of the solicitation. The government also wants to generate interest in the project and values early feedback from industry regarding the requirement. The final contract requirements are still being developed and therefore, the information provided is subject to change. Offers should not be developed based on the draft information provided in this notice.
Project Location:
The BCLH Stewardship IRSC Phase 1 project is located approximately 2 to 12 miles east of Detroit, OR within the burn scars of the Beachie Creek Fire and Lionshead Fire, both of which occurred in 2020. The total project area is 1612 acres in size and is located on the Detroit Ranger District of the Willamette National Forest. Access to the project is via State Highway 22 heading east from Detroit. The ground to be treated is within Sec 31-36, T09S, R06E; Sec 3, 4, 8-10,15-17,19,36 T09S, R06E; Sec 20,22-29, T10S, R06E; Sec 1-11, T10S, R07E; Sec 18,19, 1-5,19 T10S, R08E; Willamette Meridian, Surveyed & Unsurveyed, Marion County, Oregon. Draft Vicinity Maps which include Phase 1 as well as Phases 2 and 3 pre-solicited separately have been provided as an attachment to this notice. All the roads to be treated via this contract are detailed on the maps.
Period of Performance: The tentative date for completion of all Mandatory work is October 15, 2027. Optional work shall be completed by October 15, 2028. Fish logs must be delivered by May 1, 2026.
The anticipated operational seasons for road work activities is the dry season from approximately May 15 – October 15 annually. Ground based hazard tree work is anticipated to be permitted year-round and must comply with required protections for wet season operations and IFPL.
Description of Work:
The objectives of this project are to reduce the risks of hazardous fuels that have fallen across or remain standing along important access routes within the 2020 fire-affected road system so that access to and through the burned area can be restored. Activities include performing mitigation of risk along roads from fire killed/damaged trees, reduction of roadside fuel accumulation and essential maintenance and reconstruction of roads. The following work activities shall be required. The work shall be broken out as Mandatory and Optional work in the solicitation.
Equipment required for tree cutting will operate from within the road prism if slopes exceed 30%. Equipment may be utilized off the road prism on slopes <30% during the normal operating season (May 15th to October 15th) using slash mats. Equipment may also be allowed to operate on frozen soils/packed snow with approval from the Forest Service. See table below for estimated treatment acres by slope generated from LiDAR data. Shape files will be provided as an attachment to the solicitation.
Phase 1 Slope Data
>30% Mandatory Acres: 394, Optional Acres: 207
<30% Mandatory Acres: 314, Optional Acres: 156
Fire severity varied across the treatment areas; burn severity maps and tables shall be provided with the solicitation for planning purposes. Below is a summary of treatment acre condition.
Phase 1 Burn Severity
Low Basal Area Mortality (0-25%) Mandatory Acres: 96, Optional Acres: 92
Moderate Basal Area Mortality (26-50%) Mandatory Acres: 104, Optional Acres: 66
High Basal Area Mortality (>50%) Mandatory Acres: 532, Optional Acres: 208
Estimated Timber Volume and Species composition is as follows:
Forest product volume estimates for the cut and removal of fire killed trees is provided below. Volume quantities are made available with the understanding that values shown are Forest Service estimates and are not guaranteed. Interested Contractors are urged to examine the individual contract areas and make their own estimates. Approved LIDAR and RAV data has been used to determine volume on the BCLH Stewardship IRSC Phase 1.
Mandatory Acres - Cut and Remove Fire Killed Timber within 100’ of the road: 350 acres - 52,678 volume (TONS)
Optional Acres - Cut and Remove Fire Killed Timber within 100’ of the road: 220 acres - 24,770 volume (TONS)
Mandatory - Remove hazardous fuels greater than 16” from Unit LH-62 - within 100 feet of the road: 30 acres, 1030 volume (TONS)
Pre-Solicitation Site Visit Date and Time:
Prior to solicitation, the Forest will hold a site visit for prospective contractors to facilitate dialogue on contractual requirements that are anticipated in the contract and any operational limitations foreseen by attendees. The site visit will be held on Monday, November 4, 2024, at 9:00 a.m. PT with the initial meeting location at Detroit Ranger Station, 44125 North Santiam Highway SE, Detroit, OR 97342. Contractors shall email Karen Ruklic by noon on Friday, November 1, 2024, if they are planning to attend the meeting.
Since the solicitation will be issued while the project area is inaccessible due to snow, it is critical that interested vendors attend the site visit. Vendors that wish to view the site independently will need an approved Road Use Permit and codes for 3 gates. Review the Project Area Access Instructions provided as an attachment. Email Heidi Andersen (heidi.andersen@usda.gov), Brett Blundon (brett.blundon@usda.gov) and Darrin Neff (darrin.neff@usda.gov) at least 2 business days prior to visiting to complete the required paperwork and receive approval to access the roads and receive gates codes and/or key.
Draft Documents:
The following draft documents shall be supplied prior to the site visit:
Schedule of Items - Provided 10/29/2024
Appendix A – Technical Specifications for Service Work Items - Provided 10/30/2024
Appendix B – Timber Removal Specifications Scaled - Provided 10/30/2024
Appendix C – Road Maintenance Specifications - Provided 10/29/2024
Draft Construction Tables, Worklists and Typicals - Provided Typicals 10/29/2024, no further drafts will be provided
Draft Maps and Tables (TBD) - Provided 10/29/2024
Final Solicitation Issuance:
It is anticipated that the Request for Proposals with all attachments shall be issued on or around January 15, 2025 with award planned for approximately March 21, 2025. The contract shall be awarded using a best value source selection method; the resulting contract shall be a firm fixed price contract. Service Contract Act and Construction (Davis Bacon) Wage Determinations will be provided when the contract IRSC is solicited.
Construction Bonding:
A bid bond or other acceptable bid guarantee valued at 20% of the construction total price offered (all Mandatory and Optional Items combined) shall be required and submitted with the initial offer. Bonding shall be required in connection to the value of the awarded construction work only. Payment and Performance bonds valued at 100% of the total construction price shall be required from the contract awardee.
Point of contacts: Karen Ruklic, Contracting Officer, with the National Stewardship Contracting Branch at karen.ruklic@usda.gov, 208-702-3519 and Heidi Andersen, Disaster Recovery Project Manager, heidi.andersen@usda.gov, for questions regarding the solicitation. Follow this notice on sam.gov for future notifications.
Posting was edited on 10/21/24 to indicate how road maintenance and construction work is being broken out between Mandatory and Optional Items. Posting was edited on 10/22/24 to correct the month stated for the site visit from October to November. Draft documents provided 10/29/24 and 10/30/24. Site Visit Notes posted on 11/8/24.