This is a Request For Information.
The purpose of this effort (as described in the draft SOO) is for DMEA/DoD to obtain a comprehensive, accurate assessment of the current state, total facility improvement costs, Operations and Maintenance(O&M) costs, and projected timelines necessary to bring the existing DMEA Building 2 cleanroom space to operational status in accordance with the requirements stipulated in Section 3.0 of this document. In addition to hard facility improvement costs (labor, materials), the assessment shall include costs and schedule impacts associated with acquisition of any required permits (construction and equipment operation), and compliance with all applicable regulations governing the proposed modifications/improvements and sustained operation of the instantiated capability in the DMEA semiconductor fabrication facility.
There is a site-visit that is critical to understanding the scope of the requirement scheduled for 19 Nov 2024. Please see the RFI letter and SOO draft for more information.
The Purpose of this RFI is to ask industry questions, determine SB interest and capability, and to conduct a site visit.