Sustainment, Restoration, Modernization (SRM) – Indefinite Delivery Contract, Various locations, Alaska

Key Details
Buyer
DEPT OF DEFENSE
Notice Type
Solicitation
NAICS
236220
PSC
Z2QA
Due Date (Hidden)
Next 30 days
Posted Date (Hidden)
Past month
Key Dates
Posted Date
November 15, 2024
Due Date
October 7, 2024
Place of Performance
AK
Sam.gov Link
Link
Description

THIS IS TO IDENTIFY THE SIX CONTRACTORS SELECTED TO MOVE ON TO PHASE 2 FOR THIS ACQUISITION.  THE SIX CONTRACTORS ARE AS FOLLOWS:

Brice Solutions Inc

Bristol Prime Contractors LLC

Eklutna Construction and Maintenance

Orion Construction

Red Point Construction LLC

Weldin Construction LLC

Amendment has been posted on 3 OCT 2024 to extend proposal due date to 7 OCT 2024.

Amendment has been posted on 18 JUN 2024 to extend proposal due date to 9 JUL 2024.

The contract(s) are for a broad range of Sustainment, Restoration, Modernization (SRM) and other small
construction of various facilities and infrastructure on various military installations, as well as, at other locations in
Alaska and Wake Island. The contracts will be a Multiple Award Task Order Contract (MATOC) and will list a
variety of individual construction tasks. During the contract period, the U.S. Army Corps of Engineers (USACE)
will identify the scope of work required to complete each specific job, negotiate a price and performance time for
each job, and issue task orders to the MATOC contractor(s) to complete the work. The task orders may be
horizontal construction, vertical construction, sustainment, renovation and modernization of real property, or a
combination, and may be fully designed or Design-Build. The contractor will be required to furnish all materials,
equipment, and personnel necessary to manage and accomplish the job. The task orders will include a variety of
construction, infrastructure site improvements (such as fencing, roads, parking, airfield paving, and drainage), facility
repairs, incidental environmental work (including Hazardous Materials (HazMat), soil, and asbestos testing, removal,
disposal and containment), facility upgrades, and, system maintenance (such as Heat Ventilation Air-Conditioning
(HVAC), plumbing, electrical, wastewater treatment systems, elevators, building envelope, fire protection, Anti-
Terrorism Force Protection (AT/FP), demolition, electronic security systems), and may be fully designed (Design-
Bid-Build) or Design-Build.

Due Date (Hidden)
Next 30 days
Posted Date (Hidden)
Past month