Raw Water Piping System Replacement, Table Rock Powerhouse, White River Basin, Taney County, Missouri. Magnitude of Construction: Between $5M and $10M. Set-Aside: Full and Open Competition. NAICS: 237110, Water and Sewer Line and Related Structures Construction. SBA Size Standard: $45M. Site Visit: An organized site visit will be held on 7 August 2024 at 0900 CDT at the Table Rock Powerhouse. See clause FAR 52.236-27 Alt I for complete details. Bidder Inquiry: A Request for Information (RFI) Review has been set up at www.projnet.org for this solicitation. The ProjNet Inquiry Key is IRW386-H53JBF. The submission period is open from 24 July - 15 August 2024. Proposals are due NLT 20 September 2024 at 1200 CDT.